Well folks, the track in the airfield is starting to dwindle down to nothing and most of the layout is starting to get filled in. Today they capped off the last of the tallest sections on Skyrush; the first two airtime hills. As far as track work goes, all that needs to be installed is the footer and track for the turn before the stengel dive, the track near the far turnaround, and the return track in Founder's Circle.
3 Intamins in one photo.
Who is online?
In total there are 3 users online :: 0 Registered, 0 Hidden and 3 Guests
None
Most users ever online was 146 on Tue Aug 02, 2011 1:59 pm
Hersheypark Skyrush Construction Update #88 (2/15/12)
Ccron10- Admin
- Posts : 861
Join date : 2009-05-22
Age : 32
Location : Hershey Pa.
Re: Hersheypark Skyrush Construction Update #88 (2/15/12)
Phenomenal pictures. Much better than others I've seen online. I like that you take the time to do wider angle shots. Those give the best perspective on what this ride is.
I, like many others, was skeptical of this ride when it was announced. The layout looked tame, and the stats were lack-luster. But, as Skyrush has come to fruition, it's looking more and more like a great ride, albeit a quick one.
Thanks for putting the time in on these updates so that those of us who don't live so close can see this thing go up. I'm looking forward to May.
I, like many others, was skeptical of this ride when it was announced. The layout looked tame, and the stats were lack-luster. But, as Skyrush has come to fruition, it's looking more and more like a great ride, albeit a quick one.
Thanks for putting the time in on these updates so that those of us who don't live so close can see this thing go up. I'm looking forward to May.