Here are a few pictures from the 2012 work site, and a few points of note:
- A lot of digging has been done and a large number of trees have been completely removed. A number of markers have also disappeared since they've been digging in those areas.
- The pipes and pumps that redirect creek water from Comet to just passed the old dam has been stopped and completely removed, and is being stored in front of the former catering site.
- A dirt barrier is being built on top of the old wall lining the creek on the Park Boulevard side of Spring Creek. I figure that's to help protect the flood plane from being flooded.
The quality of these images aren't the best. I hope to get better pictures in the next few days, as long as the weather is nice.